The fuselage was a QB that had a few things to fix over this build. The latest was removal of the rivets that will hold the steps on each side of the aircraft. Also, I had to drill out rivets and place rivnuts on the aft section.
Luckily, I notice the need to make these changes before I started painting the lower half of the fuselage